The project involved the construction of cable manholes and two foundations for steel poles that support sensors and readers to monitor train passing information. Additionally, there was one foundation for a device called Wi, which organizes and records the readings, sending them to the control room.

Saudi Arabia Railway (SAR) earthing work - main

The project also included earthing connections for three new devices, which were integrated with the existing earthing network. The work commenced with excavation, followed by the installation of the manholes and three foundations according to the layout. We then established an earthing network that included copper rods, connecting them to the old network.

Furthermore, the project required electrical connections for the newly installed devices from the main generator room. All work was carried out adjacent to the railway, and our team was trained to operate with safety certifications relevant to the project.